In the city, the solid reinforced concrete has built our houses, roads and bridges. It is made of soft water and mud. It is easy to form, but if you want to break these solid objects, it is a very time-consuming and laborious project, you need a PVC pipe machine.
In the construction process, a prefabricated box girder bridge needs to be built, and the bridge is based on bored pile. In order to ensure the concrete strength at the top of the pile foundation, according to the requirements of the construction specifications, the top surface of the pile foundation pouring concrete shall be 0.5 to 1 m higher than the design pile top, but the part of the pile head higher than the design pile top shall be chiseled out before the construction of the bearing platform. According to the experience of the project department, in the past, the pile head was broken mainly by violence. When the traditional method is used to break the steel bar, the top surface of the pile head concrete will be uneven, and it will cause serious dust pollution, which is time-consuming.
Therefore, in the construction of pile foundation of Wenbo Street Bridge, it is decided to adopt the new pile head treatment technology. After the bored pile is drilled and before the reinforcement cage is installed, the constructors shall put the PVC plastic pipe processed in advance on the main reinforcement and acoustic pipe of the pile head, so that the main reinforcement and acoustic pipe in the pile head do not form a grip with the concrete, and fix their positions. After the foundation pit is excavated, they use a small cutting machine to circumscribe the pile foundation at the pile head elevation, and then drill four holes evenly, insert the steel expansion wedge symmetrically into the hole to split, so as to separate the pile head, and then use the lifting equipment to lift out the upper pile head as a whole.

Through the implementation of this innovation, the steel bar and pile head concrete top surface can be effectively protected. Although the material cost of some PVC casings is increased, the labor cost and mechanical cost of breaking the pile head are saved. The breaking cost of each pile is reduced by about 300 yuan, and the breaking time is reduced by 1.5 to 2 hours. At the same time, this construction method effectively reduces the dust pollution in the process of concrete crushing, reduces the harm to the operators, and improves the working environment.
In the face of hard reinforced concrete, they change their perspective to the interior and break it up into parts, using small PVC pipes to solve the big problem of reinforced concrete.