PVC plastic is a kind of multi-component plastic. PVC products present different physical and mechanical properties, for different applications.
Before each extruder starts, check whether there is any foreign body in the barrel, hopper and inside, check whether the fastening bolts in each part are loose, whether the safety cover is firm, and whether the switch position of each button is correct. Then add enough lubricating oil in each lubrication part to make the PVC plastic clean and hygienic.
When you are ready to drive, inform the staff around the equipment. At low speed, drive the screw to rotate the PVC products Check whether the pointer of the main motor's working ammeter swings normally. If there is any abnormal sound or the screw is not running smoothly, stop the machine immediately and ask the relevant personnel to repair and solve the problem.
No more than 3min for the empty operation test of the PVC plastic. Install the mold after everything is normal. Install the connecting bolt for the mold.
In the initial stage of feeding production, the screw should be used with the lowest working speed and the feeding should be less and uniform. Please check whether there is any abnormal swing of the PVC products.
The operator is not allowed to leave the position when the extruder is in production. If it is necessary to leave, the extruder should be stopped.
Remove the screw after parking. Apply a layer of anti-rust oil after cleaning the residual material. If it is not used for the time being, wrap it up and hang it vertically in a dry and ventilated place.
For extruders and mould that have been out of production for a long time, anti-rust oil should be applied and each entrance and exit hole should be sealed to prevent foreign bodies from entering.
PVC special efficient auxiliaries can effectively combine with the friction and lubrication of the extruder to make the extruder operate efficiently and extend its service life. "it is important to remember to choose special auxiliaries".
